ppy/OntoIOp-confcall-n42_chat-transcript_20130911b.txt ------ Chat transcript from room: ontoiop_20130911 2013-09-11 GMT-08:00 [PDT] ------ [7:51] PeterYim: . = OntoIOp team-confcall (n.42) - Wed 2013.09.11 = * Date: Wed 11-Sep-2013 * start-time: 8:00am PDT / 11:00 am EDT / 5:00pm CEST / 4:00pm BST / 12:00am[+1] KST / 1500 UTC ** ref. world clock - http://www.timeanddate.com/worldclock/fixedtime.htmlmonth=9&day=11&year=2013&hour=8&min=30&sec=0&p1=224 * Duration: 1.0~1.5 Hrs. Dial-in: * Phone (US): +1 (206) 402-0100 ... when prompted enter Conference ID: 141184# * Skype: joinconference (i.e. make a skype call to the contact with skypeID="joinconference") ... when prompted enter Conference ID: 141184# * in-session chat-workspace: http://webconf.soaphub.org/conf/room/ontoiop_20130911 * shared-file workspace for this session: http://interop.cim3.net/file/work/OntoIOp/Team_confcall/2013-09-11_team-confcall_n.42/ AGENDA: * address any comments (if there are) by OMG AB members, and discuss last preparations for Michael's presentation of the RFP at the OMG technical meeting end of September. ** see: http://interop.cim3.net/file/work/OntoIOp/Team_confcall/2013-09-11_team-confcall_n.42/RFP-OntoIOp_for-OMG-submission--TillMo-et-al_20130910b.odt * Any other business Remarks: * the session may be recorded for archival purposes. Unless otherwise documented, participants agrees to this by virtue of their participation at the session. * In case we have to mute everyone (due to extraneous noise or echo) - Mute control: *7 to un-mute ... *6 to mute * for Windows Skype users: Can't find Skype Dial pad? ... it may be under the "Call" dropdown menu as "Show Dial pad" * for Linux Skype users: please note that the dial-pad is only available on v4.1 (or later or the earlier Skype versions 2.x,) if the dialpad button is not shown in the call window you need to press the "d" hotkey to enable it. (--CLange) Attendees: TillMossakowski (chair), ChristophLange, EdSkoviak, ElisaKendall, MariaKeet, MichaelGruninger, OliverKutz, PeterYim (scribe), StefanoBorgo, TerryLongstreth. == Proceedings: == [8:01] anonymous morphed into Ed Skoviak ACORD [8:02] anonymous2 morphed into MariaKeet [8:03] List of members: Ed Skoviak ACORD, MariaKeet, MichaelGruninger, OliverKutz, PeterYim, StefanoBorgo, TerryLongstreth, TillMossakowski [8:04] PeterYim: == Till starts the meeting ... [8:04] PeterYim: Till welcomes Ed Skoviak (who is joining us for the first time) [8:04] PeterYim: Michael: have a hard stop at the hour [8:05] PeterYim: Michael: ElisaKendall says she may be a bit late [8:05] anonymous morphed into ElisaKendall [8:05] PeterYim: Till: our RFP sent to OMG on Aug-26 ... got feedback from Roy Bell (which we will review today) [8:05] List of members: ChristophLange, Ed Skoviak ACORD, ElisaKendall, MariaKeet, MichaelGruninger, OliverKutz, PeterYim, StefanoBorgo, TerryLongstreth, TillMossakowski [8:07] PeterYim: the Aug-26 submitted RDF is at: http://interop.cim3.net/file/work/OntoIOp/Team_confcall/2013-08-28_team-confcall_n.41/RFP-OntoIOp-20130826.pdf [8:08] PeterYim: Till just routed the Roy Bell comments to the list [8:10] PeterYim: ref. http://ontolog.cim3.net/cgi-bin/wiki.pl?OntoIOp#nid2XSG ... Edmund Skoviak is on the team and has already been subscribed to our mailing lists (as of 2013.07.17) [8:11] PeterYim: the credentials needed to access the pw-protected team work is: // The (role-based) authentication pair is: username = ontoiop-member password = *** // [8:12] PeterYim: [consensus] Till: from this point on, we will open up all work ... Peter will create a new workspace for the ongoing work (work before this point will continue to stay where they were, and pw-protected) [8:23] PeterYim: we can all start using the [ontoiop-forum] mailing list (which has an open message archive) instead of the [ontoiop-wg] mailing list (which has a pw-protected message archive) [8:13] PeterYim: the word doc (Aug-26 RFP) is at: http://interop.cim3.net/file/work/OntoIOp/Team_confcall/2013-08-28_team-confcall_n.41/RFP-OntoIOp-20130826.doc [8:15] PeterYim: the word doc wityh RoyBell comments is at: http://interop.cim3.net/file/work/OntoIOp/Team_confcall/2013-09-11_team-confcall_n.42/RFP-OntoIOp-20130903.rmb.doc [8:16] PeterYim: === Michael / Till: starting from section 6 [8:27] PeterYim: EdSkoviak, MariaKeet and StefanoBorgo ... I muted your lines as they are introducing some noise into the bridge ... please do a *7 before speaking (then *6 to get back to mute), if you please [8:31] MichaelGruninger: OntoIOp is not specifying how to do matching, modularization, or transformations. It is specifying the metalanguage that allows us to express the underlying relationships between ontologies. [8:32] MariaKeet: my apologies, I have to leave due to transportation logistics [8:33] MariaKeet: bye [8:33] ChristophLange: Hello, seems you can't hear me. About the "matching/alignment" issue I had a comment. In the ISO Draft we had a Terminology section, in which we clarified that "matching" is a process, whose result is the "alignment". This might have prevented the misunderstanding. [8:33] PeterYim: bye Maria [8:34] ChristophLange: Oh, please ignore my question. I see that both terms matching and alignment _are_ in the glossary already. [8:34] TerryLongstreth: Grammar on last sentence of 6.2 _ "Thus, the meta language shall enable interoperability with a formal grounding and make heterogeneous logical theories based on ---- their being amenable to ..." [8:38] ElisaKendall: [ref. the use of words like "MUST" "SHALL" "MAY" ...] Here you go: RFC-2119 Key words for use in RFCs to Indicate Requirement Levels, S. Bradner, IETF RFC 2119, March 1997. http://www.ietf.org/rfc/rfc2119.txt [8:48] PeterYim: Elisa: for the New Brunswick meeting, need to re-submit the updated version to Juergen and get a new document number [8:49] PeterYim: Elisa: I will forward that version to some other colleagues who haven't commented yet [8:50] PeterYim: Elisa: need a presentation (for the New Brunswick meeting) make sure the new document number is linked to the presentation and the ADTF Agenda [8:51] PeterYim: Elisa: ... within the presentation, ... have slides with (a) bullets of mandatory requirements, (b) bullets of optional requirements, (c) bullets of issues to be discussed [8:55] PeterYim: Elisa / Till / Michael: "presentation" will be a combination of introducing OntoIOp and introducing the RFP ... Till: some slides from previous OntoIOp presentation at the OMG Berlin meeting can be reused [8:55] PeterYim: Michael: U of Toronto is now an OMG member [8:59] PeterYim: Till: will continue discussing the Roy Bell comments via email [9:01] PeterYim: Till / Elisa / Michael: ... note that Nov-14 will be our submission deadline [9:01] TerryLongstreth: I have another meeting //// [9:03] PeterYim: Till: meeting adjourned ... next meeting, same time in two weeks - Wed 2013.09.25 (n.43) [9:03] PeterYim: -- session ended: 1602 UTC -- ------